Project Profiles - Petrochemical

Location:CanadaAg
Project Type: Main Power Distribution
MPH Project Value:U.S. $634,000
Work Scope: Design of three 15kV Cable Bus Runs at 3000A and one bus run at 4000A. These bus runs tied into the main transformers at 3 different Switchgear houses located at varied points in the plant. Average length - over 1000 ft. Special Requirements: MPHusky also designed a special housing to accommodate the 20ft. spans used on the pipe racks. This design allowed the Cable Bus housing to be installed on the pipe racks in Edmonton and then shipped to the project site.
 
Location:CanadaAg
Project Type: Cogen Facility
MPH Project Value:U.S. $438,000
Work Scope: Design of a 35kV 2500A Cable Bus Run. The bus run tied together their main transformer to a new switchgear house. This bus run traveled across the entire plant with an approximate length of over 2,000 ft. Special Requirements: MPHusky used our 20ft. support span housing design to save the client money. We also designed and tested our bus for a trench application that allowed the client to run underground in their substation, leaving access for equipment upgrades.
 
Location:CanadaAg
Project Type: Cogen Facility
MPH Project Value:U.S. $692,500
Work Scope: 5kV – 3500A and 600V – 3200A Cable Bus Systems. Included generator leads and transformer to switchgear applications.
 
Location:CanadaAg
Project Type: Cogeneration Project
MPH Project Value:U.S. $371,000
Work Scope: 15kV – 3000A and 600V – 3200A Cable Bus System for Primary Feeder application. Connections from transformer to reactor to switchgear.